The doubling of the 400 kV line in South Bohemia will strengthen the transmission system to meet future energy needs
The transmission system in the Czech Republic is facing ever-increasing demands. Rising electricity consumption, changes in the energy sector and the need for secure and reliable energy supplies require the gradual strengthening of the backbone infrastructure. One of the projects responding to these challenges is the doubling of the V432/429 line in South Bohemia. The…

















